Amarillo Blvd Traffic Light Installation Rescheduled to This Week
Last week, traffic lights were supposed to be installed, however, that was rescheduled to this week. If you travel Amarillo Blvd. be prepared to slowdown at the streets coming from downtown and expect nightly closures.
This Week's Construction:
- RESCHEDULED: From Monday, Feb. 12 through Thursday, Feb. 15, expect multiple nightly lane closures on Amarillo Boulevard at Taylor, Pierce, Fillmore, and Buchannan streets to facilitate installation of new signal mast arms. In the installation process, traffic may have to be stopped in one direction for a short period of time. Amarillo police officers will help direct traffic. If possible, find alternate routes.
- Watch for slow-moving operations in the left lanes of I-27 and I-40 in both directions for vegetation management.
- Left lanes of State Loop 335 (Soncy) will be closed in both directions from Westgate Parkway to Amarillo Boulevard (BI-40) to work on raised center medians.
- I-40 westbound, the right and center lanes will be closed at Lakeside Drive for patching repairs.
- Taylor and Pierce Streets, various lanes will be closed as you leave downtown for bridge joint repair on top of the 15th Avenue bridge.
- Various lanes of the I-40 frontage roads will be closed in both directions from Soncy Road to Pullman Road.
Ongoing projects:
I-27 and Hollywood Rd.
- The left lanes of north and southbound I-27 will be closed from Bell Street to Sundown Lane for construction of crossovers.
- As construction continues to make Loop 335 a 4-lane freeway, construction on the frontage roads begin today, as does reconstruction of the interchange at I-27 and Hollywood Road.
- The process will begin with construction of two crossovers on I-27 that will stretch from just north of Sundown Lane to just south of Bell Street. Motorists can expect lane closures as work on this portion of the project begins. The construction is expected to last 2 months, before they start the reconstruction process of the bridges at I-27 and Hollywood Road.
Loop 335 & Hollywood
- Work continues on and along the shoulders from Washington Street to I-27.
- Washington Street to I-27, the frontage road speed limit is 45 mph. The main lanes speed limit is 60 mph from Western Street to the east; there are locations with a posted 45 mph work zone speed limit.
I-27 & 26th Avenue Bridge
- I-27 southbound is reduced to two lanes from 26th Avenue to 34th Avenue.
- I-27 southbound frontage road is reduced to one lane from 26th Avenue to 34th Avenue.
- Shoulder is closed on I-27 southbound from the 26th Avenue exit ramp to the 26th Avenue bridge so crews can work on the retaining wall.
- Direct connector bridge from I-40 eastbound to I-27 southbound is closed.
I-40 Bridge Replacement & Soncy Enhancements (Soncy/SL 335)
- SL 335 may have lane closures from Westgate Pkwy to BI-40 to work on concrete medians, reducing traffic to one lane both north- and southbound.
- Interstate traffic traveling westbound is shifted to the south with one lane over the Soncy bridge.
Bell Street Bridge Replacement (at Interstate 40)
- Eastbound frontage road is reduced to one lane through the Bell Street intersection.
- I-40 is reduced to two lanes in each direction until the completion of the project.
I-40 Bridge Replacement (Ross/Arthur)
- Outside right lanes of I-40 eastbound are closed.
- Eastbound I-40 exit for Quarter Horse/Nelson Street is closed. Motorists should use the exit at Ross Street or Grand Street.
- Left lane of the eastbound I-40 frontage road is closed.
- Outside right lanes on I-40 westbound are closed.
- On-ramp at westbound I-40 and Ross/Arthur is closed. Use the detour directing westbound frontage road traffic down to Arthur Street onto the eastbound frontage road over to the Grand Street turnaround. Use the I-40 westbound Grand Street on-ramp for to enter I-40 westbound.
- On-ramp at westbound I-40 and Quarter Horse Drive is closed. Use the detour directing westbound frontage road traffic under I-40 at Nelson Street to the eastbound frontage road over to the Grand Street turnaround. Use the westbound I-40 Grand Street on-ramp to enter I-40 westbound.
- Left lane of the westbound I-40 frontage road is closed.
- Right lanes of Arthur Street at I-40 are closed in both directions.